← The Moses Lake Wire
Infrastructure

Moses Lake Roads Face Multiple Closures

πŸ”Š Listen Β· narrated by Aiden

WSDOT is closing multiple lanes on Moses Lake area highways starting August 17 through August 21.

Nightly closures include one general-purpose lane of eastbound SR 522 from 8 p.m. Tuesday to 4:30 a.m. Friday, August 18-21. A single lane of US 12 over I-5 will close nightly from 7:30 p.m. Monday to 6 a.m. Thursday, August 10-20, with a detour using northbound I-5 to Exit 71 for SR 508. The left express toll lane of northbound I-405 will close nightly from 8:30 p.m. Monday to 5 a.m. Friday, August 17-21.

Drivers should expect delays and follow detour signs. The closures are for bridge repairs, culvert work, and maintenance. Detours will be signed and flaggers will direct traffic during closures.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts12 of 17 claims supported Β· 71%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    WSDOT is closing multiple lanes on Moses Lake area highways starting August 17No usable supporting receipt β€” unverified.
  • ⚠
    WSDOT is closing multiple lanes on Moses Lake area highways through August 21No usable supporting receipt β€” unverified.
  • βœ“
    Nightly closures include one general-purpose lane of eastbound SR 522 from 8 p.m. Tuesdayβ€œ405: One general-purpose lane of eastbound SR 522 from Campus Way Northeast (milepost 10.4) to 131st Avenue Northeast (milepost 11.4) will be closed nightly from 8 p.m. Tuesday, August 18 to 4:30 a.m. Friday, August 21.”
  • βœ“
    Nightly closures include one general-purpose lane of eastbound SR 522 to 4:30 a.m. Fridayβ€œ405: One general-purpose lane of eastbound SR 522 from Campus Way Northeast (milepost 10.4) to 131st Avenue Northeast (milepost 11.4) will be closed nightly from 8 p.m. Tuesday, August 18 to 4:30 a.m. Friday, August 21.”
  • βœ“
    Nightly closures include one general-purpose lane of eastbound SR 522 from August 18-21β€œ405: One general-purpose lane of eastbound SR 522 from Campus Way Northeast (milepost 10.4) to 131st Avenue Northeast (milepost 11.4) will be closed nightly from 8 p.m. Tuesday, August 18 to 4:30 a.m. Friday, August 21.”
  • βœ“
    A single lane of US 12 over I-5 will close nightly from 7:30 p.m. Mondayβ€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    A single lane of US 12 over I-5 will close nightly to 6 a.m. Thursdayβ€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    A single lane of US 12 over I-5 will close nightly from August 10-20β€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    The left express toll lane of northbound I-405 will close nightly from 8:30 p.m. Mondayβ€œ405: The left express toll lane of northbound I-405 between Northeast 160th Street (milepost 22.61) and SR 527 (milepost 27.1) will be closed nightly from 8:30 p.m. Monday, August 17 to 5 a.m. Friday, August 21.”
  • βœ“
    The left express toll lane of northbound I-405 will close nightly to 5 a.m. Fridayβ€œ405: The left express toll lane of northbound I-405 between Northeast 160th Street (milepost 22.61) and SR 527 (milepost 27.1) will be closed nightly from 8:30 p.m. Monday, August 17 to 5 a.m. Friday, August 21.”
  • βœ“
    The left express toll lane of northbound I-405 will close nightly from August 17-21β€œ405: The left express toll lane of northbound I-405 between Northeast 160th Street (milepost 22.61) and SR 527 (milepost 27.1) will be closed nightly from 8:30 p.m. Monday, August 17 to 5 a.m. Friday, August 21.”
  • βœ“
    Drivers should expect delaysβ€œSlow down, stay focused and expect delays.”
  • ⚠
    The closures are for bridge repairsNo usable supporting receipt β€” unverified.
  • ⚠
    The closures are for culvert workNo usable supporting receipt β€” unverified.
  • ⚠
    The closures are for maintenanceNo usable supporting receipt β€” unverified.
  • βœ“
    Detours will be signedβ€œTravelers who need to cross the freeway will follow a signed detour.”
  • βœ“
    Flaggers will direct traffic during closuresβ€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”

The Moses Lake Wire is free. Get Moses Lake's news delivered every morning.