← The Moses Lake Wire
Infrastructure

Moses Lake roadwork scheduled for late July to early August

πŸ”Š Listen Β· narrated by Aiden

Washington State Department of Transportation (WSDOT) has announced several highway construction and closure projects affecting Moses Lake and surrounding areas. Starting Sunday evening, August 2, westbound SR 532 between 102nd Avenue Northwest and 104th Drive Northwest will see a traffic shift for maintenance paving, lasting until Monday morning, August 3, at 4 a.m.

Additional closures include a right lane closure on northbound SR 522 from August 5 to August 6, and alternating traffic on SR 96 from July 27 to July 31 with flaggers. SR 211 will have both-direction lane closures from 6:30 a.m. to 9 p.m. on July 31. WSDOT notes these projects aim to maintain road infrastructure and support utility work in the area.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts5 of 9 claims supported Β· 56%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    Washington State Department of Transportation (WSDOT) has announced several highway construction and closure projectsβ€œWSDOT statewide highway construction and road closure updates β€” 7/31/2026:”
  • ⚠
    The projects affect Moses Lake and surrounding areasNo usable supporting receipt β€” unverified.
  • βœ“
    Starting Sunday evening, August 2, westbound SR 532 between 102nd Avenue Northwest and 104th Drive Northwest will see a traffic shift for maintenance pavingβ€œ532: From 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving.”
  • βœ“
    The traffic shift on westbound SR 532 will last until Monday morning, August 3, at 4 a.m.β€œFrom 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving.”
  • ⚠
    There will be a right lane closure on northbound SR 522 from August 5 to August 6No usable supporting receipt β€” unverified.
  • βœ“
    There will be alternating traffic on SR 96 from July 27 to July 31 with flaggersβ€œ096: Daily from 7 a.m. to 2 p.m. beginning Monday, July 27 to 2 p.m. Friday, July 31, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 4) to State Route 9 (milepost 6) for utilities work.”
  • βœ“
    SR 211 will have both-direction lane closures from 6:30 a.m. to 9 p.m. on July 31β€œ211: Lane Closure on SR 211 both directions from milepost 2 to US-2. Beginning at 6:30 am until 9:00 pm on July 31, 2026. Flaggers and a pilot car are in place. Expect delays of about a 20 minuets.”
  • ⚠
    WSDOT notes these projects aim to maintain road infrastructureNo usable supporting receipt β€” unverified.
  • ⚠
    WSDOT notes these projects support utility work in the areaNo usable supporting receipt β€” unverified.

The Moses Lake Wire is free. Get Moses Lake's news delivered every morning.