← The Moses Lake Wire
Infrastructure

SR 14, I-405, and SR 20 Work Begins

πŸ”Š Listen Β· narrated by Aiden

Moses Lake drivers will encounter lane closures and detours beginning Wednesday, Aug. 26, for highway maintenance and repairs on several state routes. The Washington State Department of Transportation (WSDOT) has announced intermittent lane closures on SR 14 eastbound from milepost 27. 5 to 42. 14 near Riverside Drive and Ash Lake Road, effective immediately.

I-405 will have northbound lane closures from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday, Aug. 28, to 4 a.m. Monday, Aug. 31. SR 20 near Loup Loup Pass will experience slowdowns and alternating one-lane traffic Mondays through Thursdays until Aug. 27. SR 26 near Othello will have bridge repairs on Aug. 31 from 7 a.m. to 3:30 p.m. with similar traffic impacts.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts13 of 17 claims supported Β· 76%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    Moses Lake drivers will encounter lane closures and detours beginning Wednesday, Aug. 26No usable supporting receipt β€” unverified.
  • βœ“
    Lane closures and detours are for highway maintenance and repairs on several state routesβ€œ014: Maintenance on SR 14 eastbound from milepost 27.5 near Riverside Drive to milepost 42.14 near Ash Lake Road will have a intermittent lane closure. Use caution beginning at 6:42 am on August 26, 2026 until further notice.”
  • βœ“
    The Washington State Department of Transportation (WSDOT) has announced intermittent lane closures on SR 14 eastboundβ€œ014: Maintenance on SR 14 eastbound from milepost 27.5 near Riverside Drive to milepost 42.14 near Ash Lake Road will have a intermittent lane closure. Use caution beginning at 6:42 am on August 26, 2026 until further notice.”
  • βœ“
    SR 14 eastbound lane closures are from milepost 27. 5 to 42. 14β€œ014: Maintenance on SR 14 eastbound from milepost 27.5 near Riverside Drive to milepost 42.14 near Ash Lake Road will have a intermittent lane closure. Use caution beginning at 6:42 am on August 26, 2026 until further notice.”
  • βœ“
    SR 14 eastbound lane closures are near Riverside Drive and Ash Lake Roadβ€œ014: Maintenance on SR 14 eastbound from milepost 27.5 near Riverside Drive to milepost 42.14 near Ash Lake Road will have a intermittent lane closure. Use caution beginning at 6:42 am on August 26, 2026 until further notice.”
  • βœ“
    SR 14 eastbound lane closures are effective immediatelyβ€œ014: Maintenance on SR 14 eastbound from milepost 27.5 near Riverside Drive to milepost 42.14 near Ash Lake Road will have a intermittent lane closure. Use caution beginning at 6:42 am on August 26, 2026 until further notice. Effective: Aug 26, 2026, 6:42 AM”
  • βœ“
    I-405 will have northbound lane closures from the Northeast 85th Street on-rampβ€œ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.”
  • ⚠
    I-405 northbound lane closures will end at Northeast 100th StreetNo usable supporting receipt β€” unverified.
  • ⚠
    I-405 northbound lane closures are from 11 p.m. Friday, Aug. 28No usable supporting receipt β€” unverified.
  • βœ“
    I-405 northbound lane closures will end at 4 a.m. Monday, Aug. 31β€œ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place. Effective: Aug 24, 2026, 12:00 AM Expected end: Aug 31, 2026, 4:00 AM”
  • βœ“
    SR 20 near Loup Loup Pass will experience slowdowns and alternating one-lane trafficβ€œ020: Travelers on SR 20 near Loup Loup Pass will encounter slowdowns and delays while contractor crews perform pavement repairs and paving throughout the pass Mondays to Thursdays from 6 a.m. to 8 p.m. until Aug. 27. Expect alternating, one-lane, two-way traffic, automatic flaggers, temporary rumble strips and reduced speed limits.”
  • βœ“
    SR 20 slowdowns and alternating one-lane traffic will occur Mondays through Thursdaysβ€œ020: Travelers on SR 20 near Loup Loup Pass will encounter slowdowns and delays while contractor crews perform pavement repairs and paving throughout the pass Mondays to Thursdays from 6 a.m. to 8 p.m. until Aug. 27. Expect alternating, one-lane, two-way traffic, automatic flaggers, temporary rumble strips and reduced speed limits.”
  • βœ“
    SR 20 slowdowns and alternating one-lane traffic will end until Aug. 27β€œ020: Travelers on SR 20 near Loup Loup Pass will encounter slowdowns and delays while contractor crews perform pavement repairs and paving throughout the pass Mondays to Thursdays from 6 a.m. to 8 p.m. until Aug. 27. Expect alternating, one-lane, two-way traffic, automatic flaggers, temporary rumble strips and reduced speed limits.”
  • βœ“
    SR 26 near Othello will have bridge repairsβ€œ026: Travelers on SR 26 will encounter slowdowns and delays at milepost 49, about 9.5 miles east of Othello. Crews will perform bridge maintenance and repair starting Aug. 31 until Sept. 1, from 7 a.m. to 3:30 p.m. Expect alternating, one-lane, two-way traffic, flaggers and reduced speed limits.”
  • βœ“
    SR 26 bridge repairs are on Aug. 31β€œ026: Travelers on SR 26 will encounter slowdowns and delays at milepost 49, about 9.5 miles east of Othello. Crews will perform bridge maintenance and repair starting Aug. 31 until Sept. 1, from 7 a.m. to 3:30 p.m.”
  • βœ“
    SR 26 bridge repairs will occur from 7 a.m. to 3:30 p.m.β€œ026: Travelers on SR 26 will encounter slowdowns and delays at milepost 49, about 9.5 miles east of Othello. Crews will perform bridge maintenance and repair starting Aug. 31 until Sept. 1, from 7 a.m. to 3:30 p.m. Expect alternating, one-lane, two-way traffic, flaggers and reduced speed limits.”
  • ⚠
    SR 26 bridge repairs will have similar traffic impactsNo usable supporting receipt β€” unverified.

The Moses Lake Wire is free. Get Moses Lake's news delivered every morning.