← The Moses Lake Wire
Infrastructure

SR 21 Closure Near Kahlotus

πŸ”Š Listen Β· narrated by Aiden

WSDOT has closed SR 21 both directions between milepost 4 and milepost 7 for road work, beginning at 10:18 a.m. on Sept. 14, 2026. The closure will end at 5:00 p.m. on Sept. 25, 2026, with a signed detour in place. The work affects a stretch about four miles north of Kahlotus and SR 260. Motorists should expect delays during the closure period.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    SR 21 Closure Near Kahlotusβ€œ021 [46 mi from Moses Lake]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260, beginning at 10:18 am on September 14, 2026 until about September 25, 2026. Follow signed detour in place.”
  • βœ“
    Road work on SR 21 between MP 4 and MP 7 begins Sept. 14, ending Sept. 25, with detours in place.β€œ021 [46 mi from Moses Lake]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260, beginning at 10:18 am on September 14, 2026 until about September 25, 2026. Follow signed detour in place. Expect delays.”
  • βœ“
    WSDOT has closed SR 21 both directions between milepost 4 and milepost 7 for road work, beginning at 10:18 a.m. on Sept. 14, 2026. The closure will end at 5:00 p.m. on Sept. 25, 2026, with a signed detour in place. The work affects a stretch about four miles north of Kahlotus and SR 260. Motorists should expect delays during the closure period.β€œ021 [46 mi from Moses Lake]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260, beginning at 10:18 am on September 14, 2026 until about September 25, 2026. Follow signed detour in place. Expect delays. Effective: Sep 14, 2026, 10:18 AM Expected end: Sep 25, 2026, 5:00 PM”
Source text saved for this check (2026-09-20T19:09:49.355Z)
WSDOT highway construction and road closures within 50 miles of Moses Lake β€” 9/20/2026:

021 [46 mi from Moses Lake]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260,  beginning at 10:18 am on September 14, 2026 until about September 25, 2026.  Follow signed detour in place. Expect delays.
Effective: Sep 14, 2026, 10:18 AM
Expected end: Sep 25, 2026, 5:00 PM

The Moses Lake Wire is free. Get Moses Lake's news delivered every morning.