Single-lane closures and 9-foot width restrictions will begin on the Vantage Bridge on Oct. 26, 2025, according to WSDOT. The restrictions will affect both directions of traffic on I-82 between mileposts 136 and 138, with eastbound restrictions starting at Exit 110 near Ellensburg and westbound restrictions at Exit 149 near George. The work is ongoing and will be in effect 24/7 until further notice. WSDOT has not provided a specific end date for the restrictions, but the agency states they are necessary for bridge maintenance and safety. Drivers should plan for slower traffic and reduced lane widths when traveling through the area after Oct. 26.
Vantage Bridge lane restrictions begin Oct. 26
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts7 of 8 claims supported Β· 88%
Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- βSingle-lane closures and 9-foot width restrictions will begin on the Vantage Bridge on Oct. 26, 2025β090 [36 mi from Moses Lake]: Vantage Bridge milepost 136 to 138 both directions: There are single-lane closures, reduced speeds and 9-ft width restrictions in place 24/7 until further notice. Eastbound width restriction begins at Exit 110, the junction of I-82 near Ellensburg. Westbound width restriction begins at Exit 149 the junction of SR 281 near George. Effective: Oct 26, 2025, 6:00 PMβ
- βThe restrictions will affect both directions of traffic on I-82 between mileposts 136 and 138βVantage Bridge milepost 136 to 138 both directions: There are single-lane closures, reduced speeds and 9-ft width restrictions in place 24/7 until further notice.β
- βEastbound restrictions will start at Exit 110 near EllensburgβEastbound width restriction begins at Exit 110, the junction of I-82 near Ellensburg.β
- βWestbound restrictions will start at Exit 149 near GeorgeβWestbound width restriction begins at Exit 149 the junction of SR 281 near George.β
- βThe work is ongoing and will be in effect 24/7 until further noticeβThere are single-lane closures, reduced speeds and 9-ft width restrictions in place 24/7 until further notice.β
- βWSDOT has not provided a specific end date for the restrictionsβThere are single-lane closures, reduced speeds and 9-ft width restrictions in place 24/7 until further notice.β
- β The agency states the restrictions are necessary for bridge maintenance and safetyNo usable supporting receipt β unverified.
- βDrivers should plan for slower traffic and reduced lane widths when traveling through the area after Oct. 26βThere are single-lane closures, reduced speeds and 9-ft width restrictions in place 24/7 until further notice.β
The Moses Lake Wire is free. Get Moses Lake's news delivered every morning.